Dekalb County Central United School District
- New Building
- Addition
- Renovation of Historic Building
- Open Restrooms to Corridors
- Pre-K to 5 Classrooms with Integrated Technology and Hearing Assistance
- Two Playgrounds
- Parking Lot Expansion
![](https://bartoncoevilamaa.com/wp-content/uploads/2022/04/McKenney-Harrison-Elem-2019-Ensley-16-Gym-f1.jpg)
An intensive phased construction, demolition, and renovation creating a 75% new building, 25% renovated building on a tight existing site. The new exterior was designed to echo and modernize the look of the historic facade.
![](https://bartoncoevilamaa.com/wp-content/uploads/2022/04/McKenney-Harrison-Elem-2019-Ensley-2-exterior-f1.jpg)
Special features included a new cafeteria and kitchen, integrated technology and hearing assistance, restrooms open to the hallway, and two playgrounds.
![](https://bartoncoevilamaa.com/wp-content/uploads/2022/04/McKenney-Harrison-Elem-2019-Ensley-22-bathroom-f1.jpg)
![](https://bartoncoevilamaa.com/wp-content/uploads/2022/04/McKenney-Harrison-Elem-2019-Ensley-17-Class-f1.jpg)
The project required complex phasing required to add on and demolish portions of old building in order to successfully pull off the project without displacing any students.
![](https://bartoncoevilamaa.com/wp-content/uploads/2022/04/McKenney-Harrison-Elem-2019-Ensley-25-LunchRoom-f1.jpg)
![](https://bartoncoevilamaa.com/wp-content/uploads/2022/04/McKenney-Harrison-Elem-2019-Ensley-15-Music-2-f1.jpg)
![](https://bartoncoevilamaa.com/wp-content/uploads/2022/04/McKenney-Harrison-Elem-2019-Ensley-10-Entry-f1.jpg)