![](https://bartoncoevilamaa.com/wp-content/uploads/2022/06/Northrop-HS-2020-Ensley-11-Exterior-scaled.jpg)
After nearly 50 years of service, Northrop High School needed a renovation that encompassed nearly all aspects of the building.
![](https://bartoncoevilamaa.com/wp-content/uploads/2022/06/Northrop-HS-2020-Ensley-21-Entry-scaled.jpg)
![](https://bartoncoevilamaa.com/wp-content/uploads/2022/06/Northrop-HS-2020-Ensley-12-Exterior-scaled.jpg)
The envelope of the building was restored with thermally efficient windows and doors, and restored masonry. In addition, the interior office was relocated into an addition that created a new front door and secure entrance into the building.
![](https://bartoncoevilamaa.com/wp-content/uploads/2022/06/Northrop-HS-2019-Ensley-1-Cafeteria-f1-scaled.jpg)
![](https://bartoncoevilamaa.com/wp-content/uploads/2022/06/Northrop-HS-2020-Ensley-9-Auditorium-scaled.jpg)
Interior design and finishes were coordinated with district standards while allowing school-specific branding to reflect school pride of students and staff.
![](https://bartoncoevilamaa.com/wp-content/uploads/2022/06/Northrop-HS-2019-Ensley-5-Pottery-f1-scaled.jpg)
![](https://bartoncoevilamaa.com/wp-content/uploads/2022/06/Northrop-HS-2020-Ensley-14-Media-Center-Crop.jpg)