![](https://bartoncoevilamaa.com/wp-content/uploads/2023/01/St-Joe-Elem-FW-Ensley-Photo-4-Drone-f1-scaled.jpg)
St. Joe Elementary School
Fort Wayne Community Schools
- Interior and exterior renovation
- Facade replacement
- Phased construction
- Student and staff safety
- Expanded vehicle circulation route
Project consisted of a complete overhaul of a 70,820SF school including replacement of the majority of the building facade, interior renovation and complete HVAC replacement throughout the building.
![](https://bartoncoevilamaa.com/wp-content/uploads/2023/01/St-Joe-Elem-FW-Ensley-Photo-2-Media-Center-PE-F1-scaled.jpg)
![](https://bartoncoevilamaa.com/wp-content/uploads/2023/01/St-Joe-Elem-FW-Ensley-Photo-3-Media-Center-f1-scaled.jpg)
Construction was phased to allow the school to continue while the existing building was renovated.
![](https://bartoncoevilamaa.com/wp-content/uploads/2023/01/St-Joe-Elem-FW-Ensley-Photo-5-Drone-f1-scaled.jpg)
An expanded vehicle circulation route was also added to help with traffic on and off of the campus for parents, students and visitors.